Skip to main content

The HAUC(UK) APP: the latest safety information in your pocket

Learn More

Menu

Document Types

Region

App Logo

The HAUC(UK) App

The HAUC(UK) App, designed to give you the most up to date access to safety information when undertaking street and road works, whether in the office or on site.

View App

Specification and Operational Requirements for Footway Boards, Driveway Boards, Footway Ramps and Road Plates (Advice Note No 2018-01)

This section contains the performance requirements for footway boards, footway ramps, driveway boards and road plates. It includes requirements and guidance for temporarily bridging excavations to maintain pedestrian and vehicular access using ramps, boards and plates. It complements the red book.

Broadband Infrastructure Installation (Advice Note No 2017 02)

This note provides guidance for coordination of street works for High Speed broadband network build and upgrade, in particular cabinet installation and is aimed at authorities in England only.

Carriageway Incursion (TM Notification) England and Wales (Advice Note No 2017 01)

This advice note is written as a new section for inclusion within Chapter 12 of the Code of Practice for the Coordination of Street Works and Works for Road Purposes and Related Matters and the Code of Practice for Permits.

Standard Permit Response Codes (Advice Note No 2016 02)

This document is intended to be reviewed on a yearly basis. It may be decided that more or different codes are required once users have experience of using this document. The text for the specified codes is suggested and can be changed by Permit Authorities if preferred, the code itself is the crucial element to enable reporting.

Report Template for the Evaluation of Permit Schemes (Advice Note No 2016 01)

This new regulation makes provision for the content and timing of permit scheme evaluations which states that permit schemes be evaluated following the first, second and third anniversary of the scheme’s commencement and then following every third anniversary. It also requires that the outcome of each evaluation be made available within three months of the relevant anniversary.

Clarification of Use of ETON6 for Defective Apparatus(S81s) (Advice Note No 2015 Defect)

This note provides good practice advice and guidance for utility company and highway authority system users when managing Defective Apparatus/S81s within their respective ETON system; a subject which came high on the list of issues following the system group survey.